Browse Items (1 total)

  • Description is exactly "Three post-bound volumes: 1) Contract Drawings for the Construction of the SLAC Linear Collider North and South Arc Tunnel Subcontract No. 515-S-1100, 1983, Prepared by Tudor Engineering Co. 2) Conformed Contract Drawings for the Construction of the SLAC Linear Collider North and South Arc Tunnel Subcontract No. 515-S-1100, 1983, Prepared by Tudor Engineering Co. 3) Conformed Contract Drawings for the SLAC Linear Collider, Collider Experimental Hall, Subcontract No. 515-S-1101, 1984, Prepared by Tudor Engineering Co."