Browse Items (1 total)

  • Description is exactly "SLAC Linear Collider North and South Arc Tunnel construction records - Subcontract #515-S-1100. Prepared by Tudor Engineering in association with Gates and Fox. Records include transmittal memos, progress reports, claims, analysis of claims, change records, modifications, schedules, costs, inspectors reports, geology reports, surveys, Title I reports and Tunnel photos. Also includes weatherproof level books used by Tudor engineers, Gates and Fox shop drawings, As Built drawings, specifications and Operation & maintenance manual."